Halfmoon crews work on repairs ahead of next storm - NEWS10 ABC: Albany, New York News, Weather, Sports

Halfmoon crews work on repairs ahead of next storm

Posted:

HALFMOON, N.Y. – The town of Halfmoon is doing what it can to stay ahead of Thursday’s expected storm.

Construction crews were removing an old 24-inch culvert and replacing it with a 36-inch culvert Thursday afternoon because the original one wasn’t large enough to handle last week’s rainfall.

Officials declared a state of emergency in the town because of the flooding. Several homeowners had feet of water in their basements and lots of damage. Construction crews knew they had to stay ahead of Thursday’s impending rain, but they were also working on doing more.

“The highway department’s been going out checking storm drains, catch basins, streams; making sure there’s no debris in them,” Halfmoon Deputy Highway Superintendent Bill Bryans said. “Make sure the catch basins are open and all the pipes are open, so the water can flow freely. Unfortunately, when we get that amount of rain in that short period of time, pipes just fill up, and they can only handle as much as that pipe can handle, and then it overflows.”

Powered by WorldNow

341 Northern Blvd., Albany, NY 12204

Telephone: 518.436.4822
Fax: 518.426.4792
Email: news@news10.com

Can’t find something?
Powered by WorldNow
All content © Copyright 2000 - 2014 Young Broadcasting of Albany, Inc. A Media General Company.